Call Us: +90 262 606 01 76
Tower crane manufacturing - chassis being powder-coated

Tower Crane Manufacturing

Tower crane systems for your high-rise construction projects, with load capacity and reach optimized for your site.

Product Description

Tower Crane Manufacturing with Engineering Tailored to Your Site

Our tower crane projects are shaped by engineering calculations that take into account building height, the site layout plan, and the weight of the heaviest element to be lifted. Thanks to their modular tower body, our systems can be adapted to different heights and offer easy assembly and disassembly.

Automatic load limiting and overload warning systems keep operator and site safety front and center. On request, the crane can be equipped with remote control and camera-assisted visibility systems.

  • Modular tower body adapted to building height
  • Automatic load limiting and overload warning system
  • Engineering calculations based on wind load
  • Easy assembly and disassembly
  • CE/TSE compliant production
  • On-site installation and commissioning support
Welding the tower crane chassis Grinding the tower crane steel structure
Technical Specifications

Capacity and Reach Range

Max. Load CapacityProject-based, in the 1 - 20 ton range
Jib LengthVariable, based on site layout
Max. Lifting HeightModular, based on building height
Control SystemIn-cabin / remote control option
SafetyAutomatic load limiting, overload warning
ComplianceTSE / CE
Use Cases

Which Projects It Is Used In

Residential Projects

High-Rise Buildings

Infrastructure Projects

Industrial Facilities

Photo Gallery

Production and Site Photos

Frequently Asked Questions

About Tower Crane Manufacturing

How is tower crane capacity selected?

Building height, the heaviest element to be lifted, and the site layout plan are evaluated together to determine the tip load and maximum capacity.

How long does tower crane installation take?

Installation time varies depending on tower height and ground preparation; our site team manages the assembly and commissioning process end to end.

Is it resistant to wind and weather conditions?

Our tower cranes are designed according to wind load calculations defined in the relevant standards, and safety limits are monitored with an automatic load limiting system.

Do you provide operator training?

Yes, during the commissioning process our site team provides operator training and basic maintenance briefing.

Related Products

Other Cranes and Heavy Equipment

Get a Tower Crane Quote for Your Site

Tell us your building height and layout plan, and we'll recommend the right solution.

Request a Tower Crane Quote